Experience:
|
EnergyHL |
|
- January 2020 - present: EPC Manager Project Replacement Central Steam Distributor Royal FrieslandCampina Site Beilen.
- May 2022 - November 2022: Project Manager Installing, connecting and commissioning and start-up rental steam boiler Royal FrieslandCampina Site Beilen.
- January 2018 - October 2018: Project Manager Project Coupling Transformators FrieslandCampina site Beilen.
- January 2018: Consultancy steam boiler FrieslandCampina Dronrijp.
- July 2017: Consultancy completion transfer documents steam boilers.
- September 2016 - 2020: EPC
Manager FrieslandCampina DOMO Global Solutions (IPTEC) site
Beilen. Project Firefighting Facility for the powder dryers.
- September 2013 - present: EPC
Manager FrieslandCampina DOMO Global Solutions (IPTEC) site
Beilen. Project Renovation/ renewing the boiler house (cogeneration
unit and steam boilers).
- June 2016 - December 2016: CSU Manager Eneco BGR.
- July 2015 - January 2017: Project Manager FrieslandCampina Leeuwarden. Project: Reliable future steam supply.
- March 2016 - April 2016: Second Opinion Cogeneration at FarmFrites.
- Nov. 2014 - Feb. 2015: Consultancy Carbon Foot Print FrieslandCampina DOMO Beilen.
- Nov./Dec. 2014: Consulting and assessment specifications and quotations steam boiler DFE-Pharma Nörten-Hardenberg.
- July 2014: delivery of expertise technical condition and completeness of AB GT10 gasturbine skids.
- May 2014: Consultancy cogeneration FrieslandCampina Corporate Supply Chain.
- March 2014: Consultancy Value Engineering future steam supply FrieslandCampina Lochem.
- April 2014: Scouting study/ feasibility study; steam out of biomass for FrieslandCampina.
- December 2013 - March 2014: Consultancy steam/ steam boilers FrieslandCampina Borculo
- Juli - November 2013: Consultancy Energy Transition AkzoNobel Industrial Chemicals.
- March 2013 - August 2013: Consultancy Energy Supply Facilities FrieslandCampina DOMO.
- May 2011 - November 2012: Project Manager and Negotiator Vattenfall Industry Parks.
- Medio 2011 - present: Independent Entrepreneur in the field of advisement on Energy Matters, Project-, and
(interim and/or change) Management.
- 2002
– 2011 (2002 Emmtec Services
becomes 100% part of Nuon): Manager Utilities & Waste water
treathment and member MT. Total organisation appr. 100 FTE’s and
budget responsible for appr. 65 milj. euro's; also the relation
management with the costomers <scope>
- 2006
– 2011 also responsible voor the departments Inspection- en Instrumentation Services, Industrial
Cleaning, Fire Brigade and the Waste Management Department.
- 2005
– 2006 also responsible for the Industrial Maintenance
Department (appr.50 FTE’s); this Department is outsourced
in 2006
to Imtech.
- 2001/2002:
Final Responsibility for the Realisation Project of an, completely in
house build, cogeneration powerplant 25 MWe and 100
tons/hour steam.
- 1992
- 2011
Responsible as "Owner"/Program Manager (and for a number of project as Project
Manager) for the yearly Investment Program varying each year
between € 2 and 10 miljoen): Expension Investments
in production-assets, Extension Distribution Assets for new
customers or extensions at present customers, Optimazation
Investemts and Investments in the context of Major
Overhauls. Over 300 projects in total.
- Very intensive involvement in the change
process of a internally focused and all-determining Service Unit with
forced trade by the production plants, towards a commercial and
independant organisation Emmtec
Services without forged trade and placing the customers in the centre.
- 2004
- 2006: Chairman Function and Salary Classification Commision for the
transition of ORBA-classification method to the
Cassification according to the Hay-systematics.
- 1998
– 2002 (1998 foundation Emmtec
Services as an independant enterprise B.V.): Plantmanager
Utilities and Waste Water Treatment and MT-member Emmtec
Services bv. Responsible for the generation, distribution and sourcing
of all required utilities on the Industry Park.
- 1996-
1998: Akzo Nobel Chemicals BU Energy:
Plantmanager Utilities en Waste Water Treatment.
- 1992
– 1996: Akzo Nobel Fibers Service
Unit: Head of the Energy Department.
- 1991
– 1992: Akzo Nobel Aramide Emmen,
the present Teijin Aramid: Maintenance Manager, responsible for
the Technical Service Department, the maintenace and investment program
and budgets.
- 1987 – 1991: Akzo Nobel Corporate
Research Arnhem: Mathematiscal Fysisical modelling of processes.
|
|
|